EV charging at home in Arlington County, VA

Level 1 and Level 2 chargers may sit in required yards. Level 3 must stay 8 ft from the street line. A Level 2 install needs an electrical permit.

A person last checked these rules on October 20, 2026. This is guidance only, so confirm with Arlington County before you build.

The details

  • EV supply equipment is a by-right accessory use in residential districts.High confidence

Check a project at your address

SetbackIQ reads the zoning, flood zone, historic district, and environmental maps for your lot. Then it applies these rules.

What are you building?

Open the checker

Common questions

What does a home EV charger need in Arlington County?
Level 1 and Level 2 chargers may sit in required yards. Level 3 must stay 8 ft from the street line. A Level 2 install needs an electrical permit.

Sources

  1. Arlington County Zoning Ordinance §§ 3.2.5, 3.2.6.A.4, 12.9.9, 12.9.11, 12.9.12, 12.9.16, 12.9.17 and Article 18. Checked 2026-10-21
    [Visual clearance] On any corner lot in an R or RA district there shall be no planting, structure, retaining wall, fence, shrubbery or obstruction to vision between a height of three feet and a height of 10 feet above the curb level within the triangle form…

Disclaimer: This is general information, not legal or professional advice for any one property. Codes change. SetbackIQ is not a zoning determination, a permit, or a survey, and it does not replace an architect, engineer, or lawyer. Confirm with your building and zoning offices before you build, buy, or sign a contract.