Grading, easements and demolition in Prince George's County, MD

On a developed lot, grading needs no permit if you disturb no more than 5,000 sq ft at a time and under 100 cubic yards, change grade by 12 in or less without altering drainage, and stabilize bare soil promptly (§ 32-127). In the Critical Area every grading job needs a permit. Demolition needs a DPIE permit, and a HAWP at historic sites.

A person last checked these rules on October 20, 2026. This is guidance only, so confirm with Prince George's County before you build.

The details

  • No accessory structure may sit in a recorded easement or over a known utility.High confidence
  • Grading exception text from § 32-127(a)(6).High confidence

Check a project at your address

SetbackIQ reads the zoning, flood zone, historic district, and environmental maps for your lot. Then it applies these rules.

What are you building?

Open the checker

Common questions

When do grading, easements or tearing something down need approval in Prince George's County?
On a developed lot, grading needs no permit if you disturb no more than 5,000 sq ft at a time and under 100 cubic yards, change grade by 12 in or less without altering drainage, and stabilize bare soil promptly (§ 32-127). In the Critical Area every grading job needs a permit. Demolition needs a DPIE permit, and a HAWP at historic sites.

Sources

  1. Prince George's County Zoning Ordinance §§ 27-2500 (definitions), 27-5102, 27-5202, 27-5203 (accessory uses). Checked 2026-10-21
    [Family] A group of not more than five individuals all or a part of whom are not related by blood, marriage, adoption, or legal guardianship... Family child care home, small: ...up to eight children... Family child care home, large: ...9 to 12 children... A…
  2. Prince George's County Code Subtitle 32, §§ 32-127 (exceptions to grading permit), 32-131 (soils report), 32-160 (slopes). Checked 2026-10-21
    [excluding property within the Chesapeake Bay Critical Area Overlay Zone, no grading permit is required for] (6) Grading, as a maintenance measure, or for landscaping or construction purposes on existing developed lots or parcels, provided: (A) The aggregat…

Disclaimer: This is general information, not legal or professional advice for any one property. Codes change. SetbackIQ is not a zoning determination, a permit, or a survey, and it does not replace an architect, engineer, or lawyer. Confirm with your building and zoning offices before you build, buy, or sign a contract.