Do you need a permit for an EV charger in Denver, CO?
It depends on the details of your project.
Denver lists EV chargers as electrical quick-permit work.
Quick permits need no plan review.
A Level 1 cord in an outlet you already have needs no permit.
A person last checked these rules on October 19, 2026. This is guidance only, so confirm with Denver before you build.
Check your exact lot
Your zoning district sets the setbacks, and a flood zone can change the permit answer. Enter your address to see both.
Permits a EV charger can need in Denver
| Permit | When it applies |
|---|---|
| Electrical quick permit | Denver lists EV chargers as electrical quick-permit work. |
Local details
- Call 811 at least a few days before you dig footings or post holes. Utility locating is free.
- HOA covenants and deed restrictions can be stricter than city rules. Check yours before you build.
How to apply
- Denver e-permits (Accela)
- Single-family and duplex projects
- Denver zoning map
- Denver Zoning Code
- Phone: 311 (720-913-1311)
Common questions
- When does an EV charger need an electrical permit in Denver?
- Denver lists EV chargers as electrical quick-permit work. Plugging a Level 1 cord into an outlet you already have needs no permit.
- Where do I apply for an EV charger permit in Denver?
- Apply through Denver e-permits (Accela), or call 311 (720-913-1311).
Sources
- Denver CPD, Quick Permits. Checked 2026-10-22
Quick permits are trad[e]-specific permits that can be issued without the need for a plan review... [Electrical quick permits include] Electric vehicle chargers... Solar PV systems... [Boiler and A/C quick permits include] Residential A/C... Split system AC…