Skip to content
SetbackIQ

Do you need a permit for an EV charger in San Diego, CA?

It depends on the details of your project.

Every EV charger needs an electrical permit.

Charger permits at houses qualify as Simple Permits with no plans.

A Level 1 cord in an outlet you already have needs no permit.

A person last checked these rules on October 22, 2026. This is guidance only, so confirm with San Diego before you build.

Check your exact lot

Your zoning district sets the setbacks, and a flood zone can change the permit answer. Enter your address to see both.

What are you building?

Permits a EV charger can need in San Diego

PermitWhen it applies
Electrical permit (Simple Permit)San Diego requires an electrical permit for every EV charger. Homes qualify for a Simple Permit with no plans.

Local details

  • Call 811 at least a few days before you dig footings or post holes. Utility locating is free.
  • HOA covenants and deed restrictions can be stricter than city rules. Check yours before you build.

How to apply

Common questions

When does an EV charger need an electrical permit in San Diego?
San Diego requires an electrical permit for every EV charger. Homes qualify for a Simple Permit with no plans. Plugging a Level 1 cord into an outlet you already have needs no permit.
Where do I apply for an EV charger permit in San Diego?
Apply through San Diego Development Services, or call (619) 446-5000.

Sources

  1. City of San Diego DSD, Information Bulletin 187, How to Obtain a Permit for Electric Vehicle Charging Systems. Checked 2026-10-22
    An Electrical Permit is required for the installation of an EVCS... [Single dwelling units, duplexes and townhouses] qualify for Simple Permits and do not require plans or calculations.