Skip to content
SetbackIQ

Trees in Alexandria, VA

No permit is needed to remove a tree on an existing house lot outside an RPA. When work needs a grading plan, the lot must reach 25% tree canopy by planting or preserving trees (§ 7-2200).

A person last checked these rules on October 20, 2026. This is guidance only, so confirm with Alexandria before you build.

The details

  • The canopy rule covers single- and two-unit lots outside Old and Historic Alexandria and Parker-Gray.High confidence
  • In an RPA, clearing vegetation needs city review.Medium confidence

Check a project at your address

SetbackIQ reads the zoning, flood zone, historic district, and environmental maps for your lot. Then it applies these rules.

What are you building?

Open the checker

Common questions

Can I take down a tree on my own lot in Alexandria?
No permit is needed to remove a tree on an existing house lot outside an RPA. When work needs a grading plan, the lot must reach 25% tree canopy by planting or preserving trees (§ 7-2200).

Sources

  1. City of Alexandria Zoning Ordinance §§ 7-101, 7-1005, 7-2200 (Municode, Supp. 103). Checked 2026-10-21
    [7-101 permitted accessory uses] (E) Private swimming pool... (G) Freestanding air conditioning machinery... (M) Solar energy system... [7-1005] not more than 50 percent of such front, side or rear yard is used for parking of automobiles, including driveway…
  2. Virginia Chesapeake Bay Preservation Area Designation and Management Regulations (9VAC25-830-80, -140). Checked 2026-10-21
    Land development may be allowed in the Resource Protection Area, subject to approval by the local government, only if it [is water dependent, is redevelopment, or fits the other listed cases]... The 100-foot wide buffer area shall be the landward component …

Disclaimer: This is general information, not legal or professional advice for any one property. Codes change. SetbackIQ is not a zoning determination, a permit, or a survey, and it does not replace an architect, engineer, or lawyer. Confirm with your building and zoning offices before you build, buy, or sign a contract.